CHS completes the New Glenroy Special School

In December 2012, Ceiling Hoist Solultions completed a complex and extensive installation at the New Glenroy Special School.  With over a kilometre or rail systems and more than 50 XY room coverage systems, this industry-leading installation spanned from classrooms to common areas, from therapy and pool areas to change and shower rooms, and outside hoist installations.

CHS chose to supply and install Waverley Glen C450 and C625 fixed hoist units to provide seamless integration, reliability and ease of use.  Room coverage systems range from standard room sizes up to spans of more than 7 metres, complete with autogate transition gates.  Ceiling Hoist Solutions also equipped the Glenroy Special School with the patented Flexi-Link Connection System v2, the most effective and efficient portable hoist connection system currently available in Australia.

The New Glenroy Special School have expressed how thrilled they are with the new installation, and as new students begin to use the facility they look forward to utilising the intelligent design of hoists and connections systems to their fullest.  Aesthetically, the system integrated with the wall and ceiling decor and is considered an impressive installation by any standards.

If you would like to know more about this installation please contact our sales team.